I St. NW

I St. NW from 9th Ave. NW to 12th Ave. NW: Crews poured the street and some of the driveways and concrete swells.

N St. NW. from 9th Ave. NW to 100 feet past 10th Ave. NW: The second lift of rock was tested and passed. Crews poured some of the curb.

13th Ave. NE. from E St. NE to A St. NE: Crews are excavating the road starting from E St. NE.

Rockdale Bridge: City and County crews poured all three footings for the new bridge to set on. They are now working on the approach on the east side of the bridge by adding rock to the excavated areas. When this is done they'll move to the west side. The contractor building the pre-cast sections is currently working on the east side of the bridge.